Infrastructure

The existing infrastructure of the complex provides an outstanding potential for further development and construction of new production capacities. The international Port of Prahovo on the Danube, around 40 km downstream from HPP Djerdap, as one of a key advantages of this location, provides the most cost-effective form of transport to numerous markets.

Electrical supply

Within the industrial complex there is a high-voltage 110/10 KV substation with power of 2 x 31,5 MW

Steam supply

Current steam production is 55 tonnes per hour. A plant for thermal treatment of solid and liquid waste (up to 60,000 tonnes per year), is planned, with the thermal energy, also used for production of an additional 45 tonnes of steam per hour.

Water supply

A pumping station on the Danube with a capacity of 4 x 650 m³ per hour provides water supply for the industrial complex and for fire protection.